What disaster recovery costs on public cloud
When you use a public cloud cost calculator to estimate disaster recovery (DR) services, the monthly price will likely look low. That’s because public cloud providers leave out the engineering labor needed to build, test, and run your recovery plan.
—
When you use a public cloud cost calculator to estimate disaster recovery (DR) services, the monthly price will likely look low. That’s because public cloud providers leave out the engineering labor needed to build, test, and run your recovery plan.
Why public cloud quotes cause confusion
Public cloud quotes cause confusion because they aren’t selling you a finished service. When you ask a public cloud provider for a DR estimate, they calculate:
- Data storage: The cost to hold copies of your files.
- Standby compute: The cost for servers that sit idle until an outage happens.
- Data transfer: The fees charged whenever data moves across networks.
A public cloud quote doesn’t include an engineer to set up network routes, run test failovers, or handle recovery when an emergency happens. They sell you the software tools and expect your internal team to handle the rest.
Managing disaster recovery on public cloud
Managing DR on public cloud requires continuous work from your engineering team. Even if a consultant helps you build your setup, keeping your standby environment ready takes effort.
Every time your team adds a server, updates an app, or changes a network setting, your recovery plan breaks unless someone updates the standby environment to match.
Your team also has to manage day-to-day DR operations. They have to schedule and run regular test failovers, gather and store proof of recovery for compliance audits, and monitor data copies to catch and fix sync errors.
If your recovery steps aren’t written down, your team has to guess what to do under pressure. If those steps exist only in one person’s head and they are out of office during an outage, someone else has to figure out the recovery process during an emergency.
What running public cloud DR yourself costs
What running public cloud DR yourself costs is hidden labor expenses that don’t show up on an estimate.
| The work | What it costs you |
|---|---|
| Designing the standby environment | Engineering time up front |
| Setting up network routes | Engineering time up front, plus updates after every network change |
| Writing the DR runbook | Engineering time, plus updates after tests |
| Running tests and filing proof | Engineering time, every test cycle |
| Keeping standby servers updated | Ongoing engineering time |
| Maintaining on-call recovery coverage | On call pay for engineers, whether an outage happens or not |
| Handling failover during an emergency | Engineering time, at whatever hour it happens |
How to decide if managed recovery is worth the cost
Deciding if managed DR is worth the cost comes down to your team’s bandwidth. With managed disaster recovery, most of the work moves to the provider, and its cost becomes a known number.
At Nexcess, engineers write your recovery runbook with you during onboarding, monitor replication, run scheduled test failovers that save timestamped proof, and stay on the line through failover and failback. Depending on your plan, we’ll either guide your team through failover or run failover and failback for you.
Pricing is a fixed monthly amount on a 12 month term. Testing and real disasters are covered by an included allowance, with no hourly charges inside it. A one time activation fee equal to one month of DR covers runbook authoring, replication seeding, and validation. The only usage based charge is storage beyond your pool.
If your team has the time and experience to run DR well on public cloud, that can be the right choice. If you’re not sure, talk to a Nexcess engineer. We’ll look at your setup with you and help you compare costs.
Table of contents
Get hosting news and tips straight to your inbox
Join our community today.
Essential Hosting Resources to help your business stay ahead
Share this page
